Fleet charging that fits
the connection you already have

Depot and workplace charging designed around duty cycles and grid capacity, so the fleet charges without a substation upgrade.
EV charging
2,400
Charge points commissioned
0
Substation upgrades required
94%
Depot charging within off-peak
Charging built around the duty cycle

Charging built around the duty cycle

Depot charging is a scheduling problem before it is an electrical one. Model the duty cycle first and most sites charge inside the capacity they already hold.
Duty cycle and dwell-time analysis
Available capacity assessment
Load management and smart charging
Charger specification and tendering
Civils, cabling and installation
Uptime and payment operations

Why depot charging
pays for itself

Six reasons fleets that plan charging properly reach lower cost per mile than they ever did on diesel.
Lower cost per mile
Lower cost per mile
Off-peak electricity against diesel is a wide gap, and smart charging keeps the fleet inside it.
Tailpipe emissions gone
Tailpipe emissions gone
Depot electrification removes local air pollution as well as carbon, which matters to urban operators.
No substation upgrade
No substation upgrade
Load management usually spreads demand far enough that the existing connection is sufficient.
Grant funding captured
Grant funding captured
Infrastructure grants and vehicle incentives are built into the case at the modeling stage.
Uptime that holds
Uptime that holds
Chargers specified and contracted on availability, with spares held locally rather than centrally.
Future headroom
Future headroom
Ducting and switchgear sized for the fleet you will run, not only the one you run now.
Infrastructure that keeps the fleet moving

Infrastructure that keeps the fleet moving

A charger that cannot be relied on is worse than no charger, so reliability is specified and contracted rather than hoped for.
Duty-cycle modeling
Telematics data, not assumptions, decides how many charge points a depot actually needs.
Dynamic load management
Charging scheduled against site load so the connection limit is never the constraint.
Open protocols
OCPP throughout, so the hardware and the back office can be changed independently.
Contracted availability
Service agreements written against charge-point uptime with response times that match the shift pattern.

Frequently asked
questions

Frequently asked questions
Photovoltaic modules convert sunlight directly into direct current electricity, which an inverter converts to alternating current for your site or the grid. Output follows irradiance rather than demand, which is why we model your hourly load alongside the resource before fixing a system size.
Every engagement starts from your own data — interval meter readings, an asset register, or a year of on-site measurement — rather than from a template. The design that follows is sized to your load profile, site constraints and growth plan, and we show you the trade-offs we made on the way.
Advisory engagements usually run six to sixteen weeks. Built projects depend almost entirely on permitting and grid connection: a commercial rooftop can be energized inside a year, while utility-scale generation typically runs two to four years from site control to commercial operation.
Yes. We build the inventory, install the controls, map one data set out to whichever frameworks apply to you, and draft the disclosure itself. We also run assurance readiness reviews so the first engagement with an auditor is not the first time the process is tested.
We build the pathway from your asset register, aligning abatement to replacement cycles so you are not writing off working equipment. We also quantify the residual emissions honestly and help you procure durable removals against them, rather than assuming the last ten percent away.